Phase Two - Residential (Natural Hazards)
Hillside Stability Study public meeting -
Thursday, 29 March 2012
Following a well-attended public meeting on 29 March 2012, it was agreed that that the Opus Consultants' report “Hillside Stability Study – Anzac Parade/Putiki Drive” June 2011 and the report on the Shakespeare Cliff Building Line Restriction November 2009 would be made available via the “Shaping Wanganui” web site:
Hillside Stability Study (PDF, 1.01MB)
Shakespeare Cliff Building Line Restriction (PDF, 991KB)
Also available are the summary notes of the meeting:
Meeting notes (PDF, 101KB)
The conclusions and recommendations of these two reports, together with the comments made at the meeting, will be used to draft natural hazards policies as part of the District Plan review which will be the subject of further consultation. If you would like further details please contact Jonathan Barrett, Principal Planner, on (06) 349 0532 or email Jonathan Barrett.
|